Transformer Load Analysis

From your peak and average active power, see transformer loading, remaining capacity, losses and the load at which efficiency is highest, as a preliminary check.

The values you enter are processed only in your browser; they are not sent to a server or stored.

Enter the shared values once and the tools can fill them in for you.Create facility profile
kVA

Rated apparent power from the nameplate.

cos φ

Preferably the power factor at peak; an average value can understate peak kVA.

kW

Highest active power, from the bill or measurements.

kW

Average active power over the energised hours (kWh ÷ hours). Needed for the annual loss range.

W

From the nameplate or test report, in watts.

W

Load loss at rated load, in watts (at reference temperature). Without both loss values, no loss calculation is made.

h

8760 if the transformer is energised all year.

TL/kWh

To see the loss in TL.

Thresholds are a preliminary rule: below 30% is light loading, above 80% is high loading. A real loading and ageing assessment uses ambient temperature and the load profile with the IEC 60076-7 (mineral-oil-immersed) or IEC 60076-12 (dry-type) loading guide; this tool does not replace it.

Enter the transformer rating, peak active power and power factor to see the result.